The cheapest way to build a steel frame house in Australia is to choose a small standard kit design, buy the engineered steel frame as a kit, and act as your own project manager or owner builder for the stages you can legally and safely run yourself, while getting at least three quotes for every trade. The kit fixes the cost of the structure early; the savings come from how you manage the stages that follow.
This guide walks through a steel frame kit home build stage by stage: who does each stage, what an owner builder can do, and where money is saved or lost. For a comparison of all building methods (project homes, modular, kit homes, granny flats) see the cheapest way to build a house in Australia; for the cheapest house designs by size see the cheapest house to build in Australia.

What is in a steel frame kit?
BRIbuild kits are structure only. The kit covers the steel wall frames (roll-formed, cut to length, pre-punched and labelled), roof trusses, the steel subfloor system where your design uses one, and the engineering for your site. Roofing, cladding, windows, doors, plumbing, electrical, insulation, linings and fit-out are supplied and priced separately, by you or your builder.
Published kit prices in our range include the Jamieson (25 m², $35,000 + GST), the Marysville (60 m², $65,000 + GST), the Harcourt (80 m², $79,500 + GST) and the Dinner Plain (180 m², $145,000 + GST). Other designs are quoted on enquiry. See what a kit home is for the full process.
A steel frame kit build, stage by stage
The table follows the usual order of a kit home build. “Owner builder” shows what you can do yourself where your state’s owner builder permit allows it; licensed work must always be done by a licensed trade.
| Stage | What happens | Who does it | How to keep it cheap |
|---|---|---|---|
| 1. Design | Choose a plan and adjust it to the block | You, with our drafting team | Start from a standard design; keep the footprint a simple rectangle with one roof |
| 2. Site investigation | Soil test (AS 2870 site class), feature survey, bushfire attack level (AS 3959), wind rating (AS 4055) | Geotechnical engineer, surveyor, BAL assessor | Do these before you commit to a design: they decide the footings and frame engineering |
| 3. Approvals | Planning permit or DA (if required), building permit, owner builder permit | You and your building surveyor or certifier | We assist you with drafting, council planning and DA, and building permits; complete applications avoid repeat fees and delays |
| 4. Site works and footings | Earthworks, slab or footings, drainage | Excavator, concreter, plumber | On sloping or reactive sites a steel subfloor on adjustable footings can avoid heavy cut and fill |
| 5. Frame | Kit delivered; wall frames stood and braced, trusses fixed | Owner builder, carpenter or builder | Frames arrive labelled to the engineered layout; follow the drawings exactly and book the frame inspection |
| 6. Lock-up | Roofing, cladding, windows and external doors | Roofer, cladder, carpenter | Standard window sizes and one roof plane; buy materials yourself and compare supply quotes |
| 7. Services rough-in | Plumbing, drainage and electrical cabling | Licensed plumber and electrician only | Group the kitchen, bathroom and laundry to shorten runs |
| 8. Insulation and linings | Insulation, thermal breaks, plasterboard | Owner builder or plasterer | Steel conducts heat, so plan thermal breaks to meet the NCC energy rules from the start, not as a fix later |
| 9. Fit-out | Kitchen, bathroom, flooring, painting | Owner builder and trades | Flat-pack kitchens, standard fixtures; finish the core rooms first |
| 10. Final inspection | Final inspection and occupancy permit or certificate | Building surveyor or certifier | Keep every inspection record and compliance certificate as you go |
Where owner builders save money
The main saving in owner building is the builder’s margin and supervision fee. You pay each trade and supplier directly instead. In exchange you take on the scheduling, ordering, insurance, safety and quality risk. The savings are real only if the build runs to plan, so budget a contingency and allow for your own time.
- Get three quotes per trade and compare like with like: same scope, same materials, same exclusions.
- Order materials in stage order so they are not damaged or stolen while waiting on site.
- Do the unlicensed work yourself if you have the skills: frame assembly, cladding, insulation, painting, landscaping.
- Book inspections early: a missed inspection can mean opening up finished work.
- Stage the build: lock up and finish the core house first; add decks, carports and a second bathroom later.
Owner builder rules by state
| State | When you need owner builder approval | Source |
|---|---|---|
| Victoria | Certificate of consent from the Building and Plumbing Commission for domestic building work over $20,000 | BPC |
| New South Wales | Owner builder permit for residential building work over $10,000 that needs a DA or CDC | NSW Government |
| Queensland | Owner builder permit from the QBCC for work valued over $11,000 | QBCC |
Other states have their own rules; check with the state building authority before you start. See also is it cheaper to be an owner builder and our owner builder designs.
Steel frame choices that affect cost
| Decision | Lower cost when | Higher cost when |
|---|---|---|
| Footings | Level site, stable soil, slab or standard footings | Reactive clay or steep slope needing deep piers or retaining |
| Wind rating (AS 4055) | Sheltered suburban or inland sites | Exposed, coastal or cyclonic sites needing heavier bracing and tie-downs |
| Bushfire (AS 3959) | BAL-LOW or BAL-12.5 | BAL-29 to BAL-FZ: more expensive windows, cladding and screens (the steel frame itself is non-combustible) |
| Roof shape | Single gable or skillion | Hips, valleys, multiple roof planes |
| Delivery | Truck access to the site | Remote or tight sites needing smaller loads or a crane |
Delivery is quoted with your kit, anywhere in Australia, through our network in seven locations: Melbourne, Sydney, Adelaide, Gold Coast, Brisbane, Bundaberg and Perth. BlueScope offers a warranty on its TRUECORE steel; it covers the steel, not the building’s structure as a whole.
Frequently asked questions
Is a steel frame kit the cheapest way to build a house?
It is one of the cheapest ways when the design is small and simple and you manage some of the build yourself. The frame is only part of the total cost, so floor area, site conditions and who does the work decide the final figure more than the frame material.
Can I put up a steel frame kit myself?
Many owner builders assemble the frames themselves with help. The frames come labelled to the engineered layout and must be erected exactly to the drawings and inspected before lining. Plumbing and electrical work must be done by licensed trades.
What is not included in a steel frame kit?
Roofing, cladding, windows, doors, plumbing, electrical, insulation, linings, fit-out, site works, footings and council or permit fees are priced separately. The kit is the structure: frames, trusses, subfloor where used, and engineering.
Do I need a builder to build a kit home?
No. You can use a registered builder for the whole job, a builder for part of it, or build as an owner builder under your state’s permit rules. Each option changes cost, risk and how much of your time it takes.
How do I get an accurate budget?
Get the kit price for your chosen design, then quotes for site works, footings, lock-up, services and fit-out based on your soil test, BAL and wind rating. Add council and permit fees and a contingency. Average $/m² figures are not reliable enough to budget from.