Last Updated: November 4, 2026

A farmhouse kit home in NSW is a steel frame structure (subfloor, wall frames, roof trusses and engineering) for a country-style home with verandahs and simple gable roofs, which you or your builder finish with local trades. On most rural lots you can get approval either through a development application (DA) to council or, if the lot and design meet every standard, as complying development under the Rural Housing Code. Bushfire, BASIX and the owner builder permit are the other NSW rules that shape the build.

The current range has 11 farmhouse and country designs that suit NSW blocks, from a 70 m² farm cottage to a 282 m² U-shaped farmhouse.

Monica 2-bedroom country modern kit home concept

Farmhouse kit home designs for NSW

Design Bedrooms Bathrooms Size Style / price
The Briagolong 1 1 70 m² Farm cottage
The Gundagai 2 1 72 m² Verandah cottage
The Tenterfield 2 1 72 m² Country cottage
The Harcourt 2 1 80 m² A-frame with side wing, $79,500 + GST
The Mansfield 3 2 140 m² Modern farmhouse
The Benalla 3 2 150 m² Farmhouse
The Dorrigo 4 2 200 m² Barn style, two storey
The Merino 4 2 222 m² L-shaped
The Mudgee 4 2 228 m² Barn, two storey
The Homestead 4 2 250 m² Homestead
The Araluen 3 2 282 m² U-shaped farmhouse

The Harcourt is the only design in this list with a published kit price; the others are quoted for your address. Every design can be mirrored or modified, and the frame is engineered for your site. Browse the full country kit home designs, or see the guide to farmhouse kit homes for acreage for the site checks on a large block.

DA or complying development (CDC) on a rural lot

NSW has two approval paths for a new house on rural land.

Complying development (CDC) Development application (DA)
Rule set Rural Housing Code in the Codes SEPP Your council’s LEP and DCP
Who approves Council or a registered certifier Council
Zones Specified rural zones (such as RU1, RU2, RU3, RU4) and some R5 lots Any zone where a dwelling is permitted
Key limits (lots over 4,000 m²) Lot meets the minimum lot size in the LEP; building height up to 10 m; 250 m buffer from intensive land uses such as intensive agriculture or a quarry Set by the LEP and DCP; variations can be argued
Bushfire Only on BAL-LOW to BAL-29, with a BAL certificate Any BAL, assessed against Planning for Bush Fire Protection
Best for A standard design that meets every standard Larger or non-standard designs, constrained land, BAL-40 or BAL-FZ

Sources: NSW Planning circular PS 10-027 (Rural Housing Code) and the Guide to Complying Development. Your section 10.7 planning certificate and the NSW Planning Portal spatial viewer show the zone, minimum lot size and whether the land is bush fire prone. Whether a dwelling is permitted at all on a rural lot depends on the LEP, so check that first.

Bushfire rules for NSW farmhouse builds

All new homes on bush fire prone land in NSW must meet Planning for Bush Fire Protection 2019 (PBP), the NSW Rural Fire Service’s statutory standard. The bushfire attack level (BAL) for your building site sets the construction requirements under AS 3959.

  • BAL-LOW to BAL-29: complying development is possible with a BAL certificate from council or a recognised bushfire consultant.
  • BAL-40 or BAL-FZ: complying development is not permitted; you lodge a DA with a bushfire assessment.
  • Asset protection zone: the fuel-reduced area around the house is the owner’s to maintain.

BRIbuild steel frames can be engineered for sites up to BAL-FZ. The frame is one part of a bushfire design: windows, cladding, roofing, decks and sealing must also meet AS 3959 for your BAL, and those are supplied separately.

Laura 4-bedroom country kit home concept

BASIX, the building code and wind

A new house in NSW needs a BASIX certificate setting the energy and water commitments, and those commitments must appear in your plans. Wide verandahs on the north and west, which suit a farmhouse anyway, help the thermal result.

Per the ABCB adoption table, NSW stays on NCC 2022 until 1 May 2027, then moves to NCC 2025. Victoria and Tasmania moved to NCC 2025 on 1 May 2026, and WA and the ACT adopted it on 1 May 2026 while still accepting NCC 2022 until 1 May 2027.

The frame is engineered for your site’s wind classification under AS 4055 and your soil under AS 2870, which matters on exposed ridges and reactive clay common in rural NSW.

Owner building in NSW

If you will supervise or do work worth more than $10,000 on your own home without a licensed builder, you need an owner-builder permit from Building Commission NSW. Licensed contractors you engage directly must give you home building compensation cover for contracts over $20,000, and if you sell within 7 years and 6 months of the permit, the sale contract must carry a consumer warning. For the costs an owner builder carries, see is it cheaper to be an owner-builder.

What the kit includes

In the kit Supplied separately
Steel subfloor Windows and doors
Wall frames Cladding and roofing
Roof trusses (including verandah framing in the design) Insulation and flooring
Engineering for your site Delivery (quoted), footings, services, fit-out

Wondering why the envelope isn’t included? Ask us why.

BRIbuild designs, engineers, certifies, manufactures, supplies and delivers steel frame kit homes across Australia, and assists you with drafting, council planning and DA, and building permits. See BRIbuild country kit homes.

Howard 2-bedroom kit home concept

Before you choose a design

  • Get the section 10.7 planning certificate for the lot: zone, minimum lot size, bush fire prone status and flood planning.
  • Have the BAL assessed for the building site, since it can decide between CDC and DA.
  • Check access, water supply for firefighting and on-site wastewater with council.
  • Get a soil test and a site survey, especially on a slope.
  • Price the full build from local quotes, not just the frame.

Frequently Asked Questions

Can I build a farmhouse kit home under complying development in NSW?

Yes, if the lot is in a zone covered by the Rural Housing Code, meets the minimum lot size and every code standard, and the building site is BAL-29 or lower. Otherwise you lodge a DA with council.

Can a kit home be built on BAL-40 or flame zone land in NSW?

Yes, but through a DA rather than a CDC. The frame can be engineered up to BAL-FZ; the rest of the house must also meet AS 3959 for that level.

Which building code applies in NSW?

NSW uses NCC 2022 until 1 May 2027, then NCC 2025, according to the ABCB adoption table. A BASIX certificate is also needed for a new house.

Do I need an owner-builder permit in NSW?

Yes, if you supervise or do work worth more than $10,000 on your own home without a licensed builder. The permit is issued by Building Commission NSW.

What does a farmhouse kit include?

The steel subfloor, wall frames, roof trusses and engineering. Windows, doors, cladding, roofing, insulation, flooring, footings and fit-out are priced separately, and delivery is quoted.

Talk to us about your NSW block

Send us your lot details and the design you like, or call 1300 866 131, and we will quote the frame kit for your address.

Thanks! We'll be in touch soon.

Ready to Explore Kit Home Floor Plans?

Browse our collection of steel frame kit home designs or get in touch for a custom quote.

Browse Floor Plans 1300 866 131