Kit Homes for Bushfire Zones (BAL)
Kit Homes for Bushfire Zones (BAL Rated)
Any design in our range can be built in a bushfire prone area: the steel frame is engineered for your site’s wind, soil and BAL up to BAL-FZ, and the windows, doors, cladding and roofing you choose are built to the BAL your site assessment gives. The kit is the structure only (steel subfloor, wall frames, roof trusses and engineering in BlueScope TRUECORE® steel), so the bushfire specification of the envelope stays in your hands and your trades’. Ask us why.
Not sure what level your block will be? Read what BAL rating do I need first. This page is about choosing and planning a kit home design once you know you are building in a bushfire area.
Understanding BAL Ratings
The Bushfire Attack Level (BAL) under AS 3959 measures how exposed a building site is to ember attack, radiant heat and flame. There are six levels: BAL-LOW, BAL-12.5, BAL-19, BAL-29, BAL-40 and BAL-FZ (Flame Zone). In a designated bushfire prone area the National Construction Code requires a house to be built to its BAL, under AS 3959 or, for steel-framed houses, the NASH Standard for steel framed construction in bushfire areas (Australian Steel Institute). In Victoria the minimum in a bushfire prone area is BAL-12.5.
Choosing a Design for a Bushfire Prone Block
| Design choice | Why it helps at higher BALs |
|---|---|
| Simple roof form | Fewer valleys, hips and junctions to seal against embers and to fit with guards |
| Fewer, well-placed openings on the bush side | Windows and doors facing the vegetation carry the highest requirements |
| Slab or enclosed subfloor | An open elevated subfloor needs its supports and enclosure built to the BAL |
| Decks on the sheltered side | Decks and verandahs facing the bush must meet the BAL too |
| Compact footprint sited away from the bush | Distance to the vegetation is an input to the BAL assessment |
Shed-style, country and barn designs suit rural blocks with simple gable roofs; see barn style kit homes and the full floor plan range. One design is drawn for the highest level: the Daylesford BAL-FZ garden studio.
Why Steel Frames Suit Bushfire Zones
- Non-combustible framing. Steel framing does not burn.
- A steel-specific standard. The NASH Standard gives a recognised bushfire pathway for steel-framed houses as an alternative to AS 3959.
- Termite resistant. TRUECORE® steel framing is not eaten by termites, which matters on many rural blocks as well.
A steel frame does not make a house comply on its own. The BAL governs the whole envelope: gaps, vents, glazing, doors, roof, decks and subfloor.
Victoria’s Bushfire Management Overlay: Planning Pathways
In Victoria, land in the Bushfire Management Overlay (BMO, Clause 44.06 of every planning scheme) usually needs a planning permit for a new dwelling, on top of the building permit and the BAL. Check your lot on VicPlan. The state guide Building in the Bushfire Management Overlay sets out three pathways for a single dwelling, and your council confirms which one applies.
| Pathway | When it applies | Documents usually needed |
|---|---|---|
| BMO schedule | The lot is covered by a schedule with pre-set bushfire requirements (shown on VicPlan) | Bushfire Management Plan to the schedule |
| Dwellings in existing settlements | A single dwelling in an existing settlement under Clause 53.02-3 | Bushfire hazard site assessment, bushfire management statement, Bushfire Management Plan |
| All other buildings and works | Everything else in the BMO, including most rural and forested blocks | Bushfire hazard landscape assessment, bushfire hazard site assessment, bushfire management statement, Bushfire Management Plan |
The endorsed Bushfire Management Plan sets the BAL the home is built to, plus defendable space, water supply for firefighting and access for fire trucks, and the permit requires those measures to be kept up for as long as the home stands. The CFA is usually a referral authority on BMO applications, and a bushfire consultant usually prepares the assessments and the plan. Some works are exempt from a BMO permit, such as an extension to an existing dwelling of less than 50 per cent of its floor area; check the current Clause 44.06 and any schedule with your council before you design.
Outside Victoria the controls differ: in NSW, development on bush fire prone land must meet Planning for Bush Fire Protection 2019, and other states map bushfire prone areas through their planning systems.
Steps to Build a Kit Home in a Bushfire Zone
| Step | What happens |
|---|---|
| 1. Check the land | Bushfire prone area and overlays: VicPlan in Victoria (including the Bushfire Management Overlay), the bush fire prone land map in NSW, the state map elsewhere |
| 2. BAL assessment | By a bushfire practitioner or accredited consultant (in Victoria an owner may also use the Building and Plumbing Commission form; in NSW your council or an accredited consultant, not the RFS) |
| 3. Pick and adapt the design | Choose a plan and place it on the block; we engineer the frame for your site and BAL |
| 4. Planning approval where needed | A Bushfire Management Overlay in Victoria adds a planning permit with a bushfire management statement; in NSW development must meet Planning for Bush Fire Protection 2019 |
| 5. Building permit | Your building surveyor or certifier checks the design against the NCC and the BAL |
| 6. Build and inspect | Frame delivered and erected; envelope built to the BAL by your trades |
We design, engineer, certify, manufacture, supply and deliver the steel frame, and we assist you with drafting, council planning and DA, and building permits. Delivery is quoted with your kit. NCC 2025 applies in Victoria from 1 May 2026; WA and the ACT adopted it on the same date but still accept NCC 2022 until 1 May 2027; NSW, Queensland and Tasmania stay on NCC 2022 until 1 May 2027, South Australia on NCC 2022 Amendment 2 until 30 April 2027, and the NT has not adopted NCC 2025 (ABCB adoption table).
Our BAL-Rated Kit Homes
Every design below can be engineered for your site’s BAL. Published kit prices start from $35,000 + GST; other designs are quoted for your site.
Frequently Asked Questions
Can I owner-build in a bushfire zone?
Yes. The owner-builder rules are the same; the house must be built to its BAL. In Victoria an owner-builder needs a certificate of consent from the Building and Plumbing Commission for domestic building work over $20,000; in NSW an owner-builder permit is needed for work over $10,000.
How do I find out my BAL rating?
From a site assessment under AS 3959 by a bushfire practitioner or accredited consultant (or, in Victoria, the owner’s own assessment on the Building and Plumbing Commission form). It uses the vegetation type, slope, distance to the vegetation and the fire danger index for your area.
Can any kit home design be built to BAL-FZ?
The steel frame can be engineered for BAL-FZ. Whether a design works at BAL-FZ also depends on the windows, doors, cladding and roof systems tested for that level, and on the planning conditions for your site. Talk to us and your surveyor before you choose.
Do I need a planning permit to build in Victoria’s Bushfire Management Overlay?
Usually yes, for a new dwelling. The pathway depends on whether a BMO schedule covers your lot, whether it is a single dwelling in an existing settlement (Clause 53.02-3), or neither. Each needs a Bushfire Management Plan; the CFA is usually a referral authority. Check VicPlan and ask your council.
Call 1300 866 131 or send your site address and the design you like using the form below.