Kit Homes Daylesford VIC

You can build a steel frame kit home in Daylesford with a building permit from a registered building surveyor, plus a planning permit only where the Hepburn Planning Scheme zone or an overlay requires one, such as the Bushfire Management Overlay or the overlays protecting drinking water catchments. Since 15 October 2026 a small second dwelling (granny flat) of up to 80 m² usually needs no planning permit (Amendment VC306). Kit prices are published per design and cover the structure only, from $35,000 + GST, with freight quoted to your site.

Why Build a Kit Home in Daylesford

Daylesford sits in the Central Highlands about 110 km north-west of Melbourne, with steep, treed town blocks around Lake Daylesford and Wombat Hill, and lifestyle and rural land towards Hepburn Springs, Trentham, Glenlyon and the Wombat State Forest. A kit lets an owner builder or local builder order an engineered steel structure and buy the roofing, cladding, windows and fit-out locally.

Kit Home Prices in Daylesford

Kit prices are set per design and cover the structure only: TRUECORE steel subfloor where used, wall frames, roof trusses and engineering for your site. These designs have published prices:

Design Size Kit price
Jamieson A-frame retreat 25 m² $35,000 + GST
Marysville A-frame with loft 60 m² $65,000 + GST
Harcourt A-frame 80 m² $79,500 + GST
Dinner Plain grand A-frame 180 m² $145,000 + GST

Other designs are quoted for your site. See kit homes under $100k and the kit home cost per square metre guide.

Not in the kit, and priced locally:

  • Site preparation, earthworks and footings or slab
  • Roofing, cladding, windows and doors
  • Insulation, linings, flooring, kitchen and bathrooms
  • Plumbing and electrical
  • Planning and building permit fees
  • Labour, unless you owner build

Granny Flats in Daylesford: Small Second Dwelling Rules

Amendment VC306 raised Victoria’s small second dwelling limit from 60 m² to 80 m² of floor area on 15 October 2026 (Planning Victoria). The Building Regulations 2018 were amended to 80 m² from 27 October 2026 (S.R. No. 174/2026), measured to the outside walls and not counting attached decks or verandahs.

Rule What applies in Daylesford
Maximum size 80 m² floor area (since 15 October 2026, VC306)
Planning permit Normally not needed in residential and rural zones of the Hepburn Planning Scheme
When a permit is needed Lots under 300 m² in a residential zone, Green Wedge or Rural Conservation zones, or where another planning scheme provision or overlay (such as a Heritage Overlay) requires one
Bushfire Management Overlay A planning permit is needed for a small second dwelling in the BMO
No-permit conditions Only one existing dwelling and one small second dwelling on the lot, and no reticulated natural gas supplied to the small second dwelling
Lot Same lot as the existing dwelling; it cannot be subdivided off
Building permit Always needed

The 80 m² Harcourt fits the new limit. Our small second dwelling guide for Victoria and granny flat designs cover smaller options, and BRIbuild’s kit homes in Victoria page covers supply across the state.

Building Considerations in Daylesford

Creeks and flooding

Most Daylesford blocks are on slopes rather than floodplains, but land beside creeks can be mapped in the Land Subject to Inundation Overlay; check the lot on VicPlan, where the North Central Catchment Management Authority advises on flood levels. If the land is also designated flood-prone, the building permit needs the council’s report and consent under regulation 153 of the Building Regulations 2018, which usually fixes a minimum floor level. A raised steel subfloor on adjustable footings is one way to reach a set floor level without filling the site.

Bushfire Management Overlay

Parts of Daylesford, Hepburn Springs and the land around the Wombat State Forest are in the BMO. Hepburn Shire generally needs a planning permit to build a new house in the BMO, and some townships have BMO1 and BMO2 schedules with pre-set requirements and a faster pathway using a Bushfire Management Plan (Hepburn Shire Council). On land mapped as bushfire-prone, construction must meet the site’s Bushfire Attack Level under AS 3959, which mainly sets the cladding, windows, decks and roofing. Steel framing is non-combustible, and BRIbuild kits are engineered for BAL ratings up to BAL-FZ.

Water catchments and septic

The Hepburn Planning Scheme uses the Environmental Significance Overlay to control development in drinking water catchments, and a new dwelling not connected to sewer needs a Land Capability Assessment for its wastewater system (Hepburn Shire Council).

Steep blocks

A steel subfloor on adjustable footings lets a home step over a slope without large cut and fill, which also keeps disturbance down in catchment areas.

Energy, wind and soil

Victoria applies NCC 2025 from 1 May 2026 (ABCB adoption table), including the 7-star energy requirement for new homes. Check your climate zone on the ABCB climate zone map; your energy assessor sets the insulation and glazing to suit it (insulation and windows are supplied by your trades, not the kit). Victoria is in non-cyclonic wind Region A; your wind class under AS 4055 depends on terrain, shielding and topography. A site classification under AS 2870 sets the footing design.

Approvals for a Kit Home in Daylesford

Approval Who issues it When
Planning permit Hepburn Shire Council Only where the zone or an overlay (heritage, BMO, environmental significance, flooding) requires it; check the lot on VicPlan
Building permit A registered building surveyor Always, before work starts
Owner builder certificate of consent Building and Plumbing Commission On-site domestic building work over $20,000 (kit and transport not counted)

Related Areas

FAQs – Kit Homes Daylesford

Are kit homes allowed in Daylesford?

Yes. A kit home needs a building permit from a registered building surveyor, and a planning permit only where the Hepburn Planning Scheme zone or an overlay, such as a flood overlay or the BMO, requires one. Check your lot on VicPlan.

How much does a kit home cost in Daylesford?

Published kit prices run from $35,000 + GST (Jamieson, 25 m2) to $145,000 + GST (Dinner Plain, 180 m2), structure only. Footings, roofing, cladding, windows, fit-out and labour are extra, and freight is quoted.

Can I build a granny flat in Daylesford without a planning permit?

Usually, since 15 October 2026, if it is a small second dwelling of up to 80 m2 on a lot of 300 m2 or more, with no flood, bushfire, heritage or other overlay trigger and no gas connection. A building permit is always needed.

Do I need a planning permit for a house in the BMO in Hepburn Shire?

Generally yes. Some Hepburn townships have BMO1 or BMO2 schedules that set pre-determined bushfire requirements for a single dwelling and allow a faster application with a Bushfire Management Plan.

Do I need a certificate of consent to owner build in Daylesford?

Yes, from the Building and Plumbing Commission if the on-site domestic building work is worth more than $20,000. The cost of the kit and its transport are not counted.

Get a Quote for Your Daylesford Project

We assist you with drafting, council planning and DA, and building permits. Send us your address and the design you like.

Thanks! We'll be in touch soon.

Or call 1300 866 131 to discuss your Daylesford kit home project.

Ready to Find Your Floor Plan?

Browse our collection of 35+ certified kit home designs.

Browse Floor Plans 📞 1300 866 131