Last Updated: November 5, 2026
Building a kit home in Victoria takes eight steps: check what the planning scheme allows on your lot, choose or customise a design, get engineering and a soil test, get a planning permit if an overlay or zone needs one, get a building permit from a registered building surveyor, get owner builder consent if you are building it yourself, then build through the mandatory inspections to an occupancy permit. This guide walks through each step with the Victorian rules and links to the regulator. For prices and country designs, see country kit homes Victoria prices; for a second home of up to 80 m², see the small second dwelling guide. The Building Regulations 2018 still define a small second dwelling as up to 60 m², and VC306 has conditions (no reticulated gas, one existing dwelling, and a planning permit on lots under 300 m²), so ask your building surveyor how a 60 to 80 m² design is assessed.
What a kit home in Victoria includes
A kit home is a house whose structure is designed, engineered and manufactured off site, then delivered to your block for a builder or owner builder to erect. The kits on this site are structure only: a BlueScope TRUECORE steel subfloor, wall frames, roof trusses and the engineering for your site. Windows, doors, cladding, roofing, insulation, flooring, kitchens and bathrooms are bought and installed separately, so you choose the finishes and the trades.
| Part of the build | In the kit | Priced separately |
|---|---|---|
| Steel subfloor (bearers, joists) | Yes | |
| Steel wall frames | Yes | |
| Steel roof trusses | Yes | |
| Engineering for your site | Yes | |
| Footings or slab, site works | Your concreter or builder | |
| Roofing, cladding, windows, doors | Your suppliers | |
| Insulation, plasterboard, flooring | Your suppliers and trades | |
| Kitchen, bathroom, plumbing, electrical | Licensed trades |
Published kit prices start at $35,000 + GST for the 25 m² Jamieson and $65,000 + GST for the 60 m² Marysville. Other designs are quoted; see the kit home pricing guide and the kits under $30k.
Step by step: building a kit home in Victoria
| Step | What you do | Who decides or issues it |
|---|---|---|
| 1. Site check | Look up your zone and overlays on VicPlan; check easements, access and services | Planning scheme (your council) |
| 2. Design | Pick a plan or customise one to suit the lot, orientation and budget | You and the designer |
| 3. Site reports | Soil test (AS 2870 site class), wind classification (AS 4055), BAL assessment if bushfire prone | Geotechnical engineer, building designer, BAL assessor |
| 4. Planning permit | Only if the zone or an overlay (BMO, heritage, flood, vegetation) needs one | Council |
| 5. Building permit | Lodge drawings, engineering, energy rating and site reports | Registered building surveyor (council or private) |
| 6. Owner builder consent | Certificate of consent if you build it yourself and the work is over $20,000 | Building and Plumbing Commission |
| 7. Build and inspect | Footings, frame erection, lock-up, fit-out; call the surveyor at each mandatory stage | Building surveyor |
| 8. Occupancy | Final inspection and occupancy permit before you move in | Building surveyor |
1. Check the planning scheme first
Search your address on VicPlan to see the zone and every overlay on the lot. A Bushfire Management Overlay (BMO), Heritage Overlay, Land Subject to Inundation Overlay or Vegetation Protection Overlay can each trigger a planning permit and change the design. Under the BMO, the planning.vic.gov.au technical guide sets out the bushfire site assessment and defendable space you will need to show.
2. Choose a design that suits the block
Match the plan to the lot width, slope and north aspect before you fall in love with a floor plan. Narrow suburban lots suit compact single or double storey plans; sloping rural blocks often suit a steel subfloor on adjustable footings rather than a cut-and-fill slab. Browse country kit home designs or have a plan changed through custom design kit homes.
3. Get the site reports
Your building surveyor will need a soil report to set the site class for footings (AS 2870), a wind classification (AS 4055) and, on bushfire-prone land, a BAL assessment under AS 3959. Steel frames can be engineered up to BAL-FZ; see kit homes in bushfire zones.
Planning and building permits in Victoria
A planning permit decides whether you can build that use and form on the land; many houses on standard residential lots do not need one, but overlays often trigger one. A building permit is always needed for a new house and is issued by a registered building surveyor, either at council or privately. It confirms the design complies with the building regulations and the National Construction Code.
Which building code applies
Victoria adopted NCC 2025 on 1 May 2026 for projects whose design started after that date, per the ABCB adoption table. Earlier designs may still be assessed under NCC 2022; confirm with your building surveyor.
Small second dwellings up to 80 m²
From 15 October 2026 (amendment VC306) a small second dwelling of up to 80 m² can be built without a planning permit on many lots, if it meets the conditions. See the planning.vic.gov.au small second dwellings page, the BPC guidance and our granny flat size limits by state. A building permit is still required.
Mandatory inspections
Your building permit lists the stages at which the building surveyor must be notified, commonly before footings are placed, before reinforced concrete is poured, at frame stage and at completion. The frame inspection is where a factory-made steel frame is checked against the engineering. You cannot occupy the home until the surveyor issues an occupancy permit or certificate of final inspection.
Building it yourself as an owner builder in Victoria
If you manage the build yourself and the value of the domestic building work is more than $20,000, you need a certificate of consent from the Building and Plumbing Commission before the building permit is issued. To be eligible you must own the land, pass the BPC owner-builder eLearning assessment and complete construction induction training (BPC eligibility). Consent is generally limited to once every five years for a different home, with an exception for a small second dwelling. If you sell within about six and a half years of completion, you need a section 137B defects report and domestic building insurance before the sale contract; see selling an owner-built home.
Kit homes already built in Victoria
These BRIbuild steel frame kit homes have been built across Victoria. Each project page shows the plan and photos.
| Project | Region | Bedrooms | Floor area |
|---|---|---|---|
| Tobin, Yea | Murrindindi | 3 | 120 m² |
| Venus Bay | South Gippsland | 2 | 85 m² |
| Narracan, Heathcote | Central Victoria | 2 | 72 m² |
| Lexton | Pyrenees | 2 | 65 m² |
| Wyndham, Melbourne | Melbourne | 4 | 180 m² |
| Garden studio, Daylesford (BAL-FZ) | Hepburn | Studio | 68 m² |
Also see Martins Place, Penshurst and the Dawson, Camperdown. For A-frame designs, visit A-Frame Kit Homes; for steel frame kits generally, see Steel Frame Kit Homes.
Budgeting for a Victorian kit home
The kit is one line in the budget. Get a written quote for each of these before you commit; they depend on your site, so no honest per-square-metre figure covers them.
| Cost line | Who prices it |
|---|---|
| Kit (structure only) | Published price or quote |
| Soil test, survey, BAL assessment | Engineer, surveyor, assessor |
| Planning and building permit fees | Council and building surveyor |
| Delivery to site | Quoted with the kit |
| Footings or slab, site works | Concreter or excavator |
| Frame erection | Builder, carpenter or you |
| Roofing, cladding, windows, doors, insulation | Suppliers and trades |
| Services connection, plumbing, electrical | Licensed trades and utilities |
| Internal fit-out | Suppliers and trades |
How BRIbuild supplies kit homes in Victoria
BRIbuild designs, engineers, certifies, manufactures, supplies and delivers steel frame kits from its network in seven locations: Melbourne, Sydney, Adelaide, Gold Coast, Brisbane, Bundaberg and Perth. We assist you with drafting, council planning and DA, and building permits. Delivery is quoted with your kit. Owner builder and builder project specialists. Contact us or call 1300 866 131.
Frequently Asked Questions
Do I need a building permit for a kit home in Victoria?
Yes. Every new house in Victoria needs a building permit from a registered building surveyor, whether it is a kit home or not. A planning permit is needed only where the zone or an overlay on your lot requires one.
Can I build a kit home myself in Victoria?
Yes, as an owner builder. If the work is worth more than $20,000 you need a certificate of consent from the Building and Plumbing Commission before your building permit is issued, and licensed trades still do the plumbing and electrical work.
What is included in a kit home?
The kits on this site are structure only: steel subfloor, wall frames, roof trusses and engineering. Roofing, cladding, windows, doors, insulation, flooring and fit-out are bought separately.
Which building code applies to a kit home in Victoria?
NCC 2025 applies in Victoria to projects whose design started on or after 1 May 2026, according to the ABCB adoption table. Your building surveyor confirms which edition applies to your permit.
Can a kit home be a granny flat in Victoria?
Yes. Since 15 October 2026 a small second dwelling of up to 80 m² can be built without a planning permit on many lots if it meets the VC306 conditions. It still needs a building permit.
Can a steel kit home be built in a bushfire area?
Yes. Steel frames can be engineered for every Bushfire Attack Level up to BAL-FZ under AS 3959. Your BAL assessment sets the construction requirements, and a BMO may also need a planning permit.