Last Updated: November 4, 2026

WA’s planning reforms let many owner builders skip council development approval altogether. A single house that meets every deemed-to-comply provision of the Residential Design Codes (R-Codes) is exempt from development approval under clause 61 of the deemed provisions, and since April 2024 a granny flat (ancillary dwelling) of up to 70 m² on any lot size is exempt too when it meets the deemed-to-comply rules. You still need a building permit, and owner-builder approval for work over $20,000.

What changed in WA’s housing planning reforms

Change What it means for an owner builder Source
Single houses exempt from development approval when they meet the R-Codes deemed-to-comply provisions A compliant design goes straight to a building permit, with no DA to council. Heritage-protected places are excluded. Deemed provisions cl 61; Planning Bulletin 112/2024
Clause 61A deemed-to-comply check You can ask council in writing to confirm your design is exempt before you lodge for a building permit. WA Planning form
Ancillary dwellings: 350 m² minimum lot size removed (April 2024) A granny flat up to 70 m² internal floor area needs no planning approval if it meets all deemed-to-comply rules (setbacks, site cover, height, privacy, access). WA Government info sheet
Anyone can live in a granny flat Family, friends or tenants under a rental agreement. WA Government info sheet
Ancillary dwellings allowed with grouped dwellings and strata lots Not only behind a single house on its own lot. WA Government info sheet

Building permits still apply in WA

Yes. The planning reforms remove the development application, not the building permit. Every new house and granny flat needs a building permit from the local government and must comply with the National Construction Code.

Under the Building Act 2011 there are two ways to apply. A certified application comes with a certificate of design compliance signed by an independent building surveyor, and the permit authority has 10 business days to decide it. An uncertified application, available only for single houses and their sheds, leaves the certification to the local government, which has 25 business days (Building Act 2011 overview).

WA adopted NCC 2025 on 1 May 2026, but NCC 2022 is still accepted until 1 May 2027 (ABCB adoption table). Ask your building surveyor which edition your application uses.

Owner-builder approval in WA

Owner-builder approval is needed when the work needs a building permit and is valued over $20,000 ($50,000 for sheds and garages), and you generally cannot apply again within six years (WA Government). Owner-builder work covers a detached house, including a detached granny flat, and you must intend to live on, occupy or use the land when the work is finished, with no immediate intention to rent or sell; once approved you have six months to apply for the building permit. The planning reforms do not change these rules. On 21 July 2026 the WA building regulator also warned that prefabricated pods and buildings have no special permit exemption, and that a habitable building over $20,000 must be installed by a registered builder or an approved owner-builder (WA Government announcement).

Choosing your approval pathway

Your project Planning Building
Single house that meets every R-Codes deemed-to-comply provision, not heritage-protected Exempt (confirm with a clause 61A check if unsure) Building permit
Single house that needs a design-principles assessment (for example a reduced setback) Development application to council Building permit after approval
Granny flat up to 70 m² meeting deemed-to-comply rules Exempt Building permit
Granny flat over 70 m², or one that misses a deemed-to-comply rule Development application Building permit
Heritage-protected place, or a site under a structure plan or local development plan with extra rules Check with council; a DA is likely Building permit

Being exempt from planning does not remove site rules that apply at the building stage. In a bushfire-prone area you still need a BAL assessment under AS 3959; see what BAL rating you need for a kit home in a bushfire zone.

Picking a kit home design that stays exempt

BRIbuild kits are structure only: steel subfloor, wall frames, roof trusses and engineering. Windows, doors, cladding, roofing, insulation and flooring are bought separately. Ask us why. We assist you with drafting, council planning and DA, and building permits, and the engineering is done for your site’s wind and soil.

Common mistakes

  • Assuming “exempt” means no approvals at all. The building permit is always needed.
  • Buying a kit before checking the design against the R-Codes for your lot’s density code.
  • Measuring a granny flat by its external footprint rather than internal floor area, or the other way round. Confirm the basis with your building surveyor.
  • Forgetting owner-builder approval for work over $20,000.
  • Leaving finance late: lenders usually want the building permit before construction drawdowns; see how to get a home loan for a kit home in Australia.

WA planning reform FAQs

Do I need development approval for a single house in WA?

Not if the house meets every deemed-to-comply provision of the R-Codes and the place is not heritage-protected. If any provision needs a design-principles assessment, you need a development application.

Can I build a granny flat in WA without council approval?

You can skip planning approval for an ancillary dwelling up to 70 m² that meets all deemed-to-comply rules, on any lot size. You still need a building permit from the local government.

Does the exemption apply to battle-axe blocks?

The exemption depends on the design meeting the R-Codes, not on the lot shape. Battle-axe lots often have tighter setback and access rules, so a clause 61A check is worth asking for.

Can a two-storey house be exempt?

Yes, if it meets the deemed-to-comply provisions for building height, overshadowing and visual privacy. Two-storey designs fail these more often, so check early.

Did the reforms change owner-builder rules in WA?

No. Owner-builder approval is still needed for work over $20,000 that needs a building permit, and you generally cannot apply again within six years.

Talk to us about your WA kit home

Tell us your lot, density code and the design you like, and we will help you work out the pathway. Call 1300 866 131.