Last Updated: November 2, 2026
You do not choose your BAL: it comes from a site assessment under AS 3959 that looks at the vegetation type, the slope and the distance between your house and the bush, and gives one of six levels from BAL-LOW to BAL-FZ (Flame Zone). In a designated bushfire prone area the National Construction Code requires a house to be built to that level, either under AS 3959 or, for a steel-framed house, under the NASH Standard for steel framed construction in bushfire areas. In Victoria the minimum in a bushfire prone area is BAL-12.5 (Murrindindi Shire Council).
This guide explains the six levels, how the assessment works, who does it in each state, what changes in a kit home at each level and what a steel frame kit covers. Get the BAL before you finalise the floor plan or buy anything: it sets the windows, doors, cladding, vents, decks and subfloor details.
The Six BAL Levels at a Glance
| BAL | Exposure (AS 3959) | What it means for the build |
|---|---|---|
| BAL-LOW | Insufficient risk to warrant specific construction requirements | No bushfire construction requirements |
| BAL-12.5 | Ember attack; radiant heat up to 12.5 kW/m² | Ember protection: sealed gaps, screened vents, weepholes and openings |
| BAL-19 | Increasing ember attack and burning debris; up to 19 kW/m² | Stricter requirements for glazing, screens and external materials |
| BAL-29 | Increasing ember attack and burning debris; up to 29 kW/m² | Tougher glazing and frames; more elements must be non-combustible or tested |
| BAL-40 | Increasing ember attack and debris, with possible exposure to flames; up to 40 kW/m² | Tested or non-combustible systems for many elements; approval is more involved |
| BAL-FZ | Direct exposure to flames from the fire front; above 40 kW/m² | Tested systems throughout; in some places a performance solution or extra planning conditions |
The exact requirements for every element (walls, windows, doors, roof, vents, decks, subfloor, water and gas supply) are set out level by level in AS 3959 or the NASH Standard. Your designer and building surveyor or certifier apply them to your plan; this page does not replace that.
How the BAL Is Assessed
The assessment follows the AS 3959 method. The assessor:
- finds the fire danger index that applies to your area;
- classifies the vegetation around the site (for example forest, woodland, scrub, shrubland, grassland);
- measures the effective slope under that vegetation;
- measures the distance from the proposed building to the vegetation;
- reads the BAL from the tables or calculates the radiant heat at the building.
Because distance is one of the inputs, where you put the house on the block can change the result. Ask for a preliminary assessment while you are still choosing the site of the house and the floor plan. Clearing that is not yet done, sprinklers and plant choices do not change the classification of vegetation that is there at assessment.
Who Does the BAL Assessment in Each State
| State | Where to check the land | Who assesses |
|---|---|---|
| Victoria | Bushfire Prone Area and Bushfire Management Overlay on VicPlan | A bushfire practitioner, or the owner using the Building and Plumbing Commission form; the building surveyor needs it for the building permit. A BMO adds a planning permit with a bushfire management statement, and the site and landscape assessments that go with it. |
| NSW | Bush fire prone land map (council or NSW Planning Portal) | Your council or an accredited bush fire consultant; the NSW RFS does not issue BAL determinations (NSW RFS BAL fact sheet). Development must also meet Planning for Bush Fire Protection 2019. |
| Other states and territories | The state planning or fire agency’s bushfire prone area map | An accredited bushfire practitioner; your certifier or surveyor confirms what is needed for the permit |
What Changes in a Kit Home as the BAL Rises
| Element | What to plan for |
|---|---|
| Frame | Steel framing is non-combustible. The BAL still governs everything that encloses it. |
| Vents, weepholes and gaps | Ember screening with mesh of 2 mm maximum aperture in corrosion-resistant steel, bronze or aluminium, and sealed gaps at ridges, eaves and junctions |
| Windows and glazed doors | Frame material, glass type and screens or shutters set by the BAL |
| External doors and garage doors | Seals and screening; large doors are a common weak point |
| Roof | Sarking and sealing at ridge and eaves; gutter and valley guards where required |
| Subfloor | An elevated subfloor is enclosed or its supports are built to the BAL |
| Decks and verandahs | Decking and supports to the BAL; non-combustible materials at the higher levels |
We do not publish dollar figures for “the cost of each BAL”. The extra cost depends on the house, the windows and doors you choose, the block and your trades, so get prices from your suppliers once the BAL and plan are known.
AS 3959 or the NASH Standard?
For a steel-framed house there are two recognised pathways: AS 3959 Construction of buildings in bushfire-prone areas, and the NASH Standard: Steel Framed Construction in Bushfire Areas, published by the National Association of Steel-Framed Housing (Australian Steel Institute). One pathway is used for the whole building; they are not mixed. Your designer and building surveyor choose the pathway with you. NCC 2025 applies in Victoria from 1 May 2026; WA and the ACT adopted it on the same date but still accept NCC 2022 until 1 May 2027; NSW, Queensland and Tasmania stay on NCC 2022 until 1 May 2027, South Australia on NCC 2022 Amendment 2 until 30 April 2027, and the NT has not adopted NCC 2025 (ABCB adoption table).
What a Steel Frame Kit Covers in a Bushfire Zone
A kit from Kit Home Floor Plans, supplied by BRIbuild, is the structure only: steel subfloor, wall frames, roof trusses and engineering, in BlueScope TRUECORE® steel, engineered for your site’s wind, soil and BAL up to BAL-FZ. Windows, doors, cladding, roofing, insulation and flooring are not in the kit. You and your trades choose them to meet the BAL, which keeps the specification in your hands. Ask us why.
| In the kit | Not in the kit |
|---|---|
| Steel subfloor, wall frames, roof trusses, engineering | Windows, doors, cladding, roofing, insulation, flooring, footings, BAL assessment |
Published kit prices start from $35,000 + GST, about $806 to $1,400 per m² + GST on the designs that show a price; see how much kit homes cost. Browse all floor plans, or see a design drawn for the highest level, the Daylesford BAL-FZ garden studio. For designs suited to bushfire areas, see kit homes for bushfire zones.
Frequently Asked Questions
What BAL rating do I need for my kit home?
The rating that a site assessment under AS 3959 gives your block. It depends on the vegetation, slope and distance to the bush. In Victoria the minimum in a bushfire prone area is BAL-12.5; outside a bushfire prone area there is usually no BAL requirement.
Do I need a BAL assessment for a granny flat or studio?
A habitable building in a bushfire prone area, including a granny flat or small second dwelling, needs to be built to its BAL. Ask your building surveyor or certifier what applies to a non-habitable outbuilding on your site.
Can I lower my BAL rating?
Often, by siting the house further from the vegetation, because distance is an input to the assessment. Plan the siting with the assessor before the design is final. Planned future clearing does not count unless it is approved and done.
Who can do a BAL assessment in Victoria?
A bushfire practitioner, or the owner using the Building and Plumbing Commission’s self-assessment form. A Bushfire Management Overlay also needs a planning permit with a bushfire management statement.
Does a steel frame mean I meet the BAL?
No. The steel frame is non-combustible, but compliance depends on the whole envelope: gaps, vents, glazing, doors, decks and subfloor, built to AS 3959 or the NASH Standard.
Does the kit include BAL-rated windows and cladding?
No. The kit is the structure only: steel subfloor, wall frames, roof trusses and engineering. Windows, doors, cladding and roofing are chosen by you and your trades to meet the BAL.
Get Advice for Your Block
Send us your site address and BAL (or tell us it is not assessed yet) and the design you like. We design, engineer, certify, manufacture, supply and deliver the frame for your site and BAL, and we assist you with drafting, council planning and DA, and building permits. Call 1300 866 131 or use the form below.